In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

A sample of hydrated calcium sulfate has a mass of 20.88 g. After it is heated, it has a mass of 16.51 g. What is the percentage by mass of water in the hydrate
A triangle has two sides of lengths 4 and 7. What value could the length of the third side be ? check all that apply A.3 B.5 C.7 D.9 E.11 F.17
Find the percent of the number. 100% of 20
Identify the strongest attractive forces between the particles of each of the following A.CH3OH B.CO C.CF4 D.CH3-CH3
How many chromosomes are in a diploid human cell?
do the two chromosomes in a pair have the same genes lined up in the ''same order'', or not ?
i dont understand can you explain this Perhaps you wanted pizza for dinner, but was out voted by the rest of the family who wanted chili. This is similar to wh
Under the feudal system, a higher noble granted land to a lower noble in exchange for
How are the O and A horizons similar?
Using the FOIL method, find the product of x - 2 and x - 3 . A. x^2 - 5x - 6 B. x^2 - 5x + 6 C. x^2 - x - 6 D. x^2 + x + 6