hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

Graph the linear equation x-3y=-6
What happens to the atoms that make up ethanol as it burns?
Calculate the equivalent decimals for the following fractions. a. 1/4 b. 2/5 c. 2/3 d. 3/4
Approximately 90 percent of the mass of the milky way is located in the halo of the galaxy in the form of dark matter. True or false?
a carpenter agrees to work under the condition that she is to be paid $55 every day she works and she must pay $66 every day she does not work. at the end of 30
What Structure formed by the crossing over of the optic nerves
What does work or fight cartoon mean
PLEASE HELP A square has an area of 64 square units. Which set of coordinates could be the vertices of the square? A) (3, –35) and (3, –28) B) (21, –14) and (2
A mass moves back and forth in simple harmonic motion with amplitude A and period T. a. In terms of T, how long does it take for the mass to move through a tota
Given the equation of a circle, determine the center and the radius.〖(x+5)〗2+〖(y-1)〗2=9. The equation of a circle is (x-h)2 +(y-k)2 = r2