15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

What college did martin luther king jr his father and his grandfather go to?
What is the fourth term of the sequence? a1 = m an = 2an-1
I'm kind of confused on what I got wrong on this math question....can someone plz explain
What should be the first step in the writing process? A. Plan B. Edit C. Proofread D. Research
This is civics homework
A set of shelves fits an attic room with one sloping wall. the left edges of the shelves line up vertically, and the right edges line up along the sloping wall.
What was a major reason for united states entry into world war i?
An object is dropped from a platform 400 ft high. ignoring wind resistance, what will its speed be when it reaches the ground?
What gases are exchanged in the lungs during breathing?
What is the most common problem associated with power surges?