makailawilliams123 makailawilliams123
  • 03-11-2016
  • Mathematics
contestada

Tom works for a manufacturing plant and makes $7.00 per hour. Last week he worked 49 hours. For the hours above 40, he receives time-and-a-half. What did Tom earn last week?

Respuesta :

Aliwohaish12
Aliwohaish12 Aliwohaish12
  • 03-11-2016
40*7+9*(7+7/2)=374.5
Answer Link

Otras preguntas

Why is it good to have theTen Commandments
Which of the following numbers must be odd? (A) The sum of an odd number and an odd number. (B) The product of an odd number and an even number. (C) The sum of
in document C examine British naval expenses in 1914. Do the Germans have a reason to worry about the freedom of the seas explain
how many roots do the following equations have? -12x^2 - 25x+5 +x^3=0
what is the name for the protective structure that forms around the embryo
You sign up for 13 weeks of swim lessons. The total cost is 325$. What is the cost per week?
The sum of the page numbers of two facing pages in a book is 145. What are the page numbers?
Write an expression that represents The sum of eight and twice a number
Factor completely 16x4 - 64y8
A motorized scooter has tires with a circumference of 22 inches. The tire makes one revolution every 1/10 second. Find the speed of the scooter in inches per se