medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

preserved remains have turned to what?
Please order -4 1/2,5.6,-2 3/8, and 1.35
The cardiovascular system is also known as the ________.
ratios and rates problems out of 32 students 5 said they ride their bikes to school.Based on results, how many of the 800 students in the school ride their bike
Which of the following are you most likely to need when recovering an escaped cat? A. A head snare B. A cat bag C. Pepper spray D. Restraint gloves
What is a person called who brings goods into the country illegally
What organs make up the central nervous system? a. Heart b. Brain and spinal cord c. Lungs d. Liver
Mapmakers use units called _____ to measure angles on earth's surface
La profesora _______ la clase. (6 letter word)(ends with an a)
Which disorder is characterized by the following: a pattern of recurring thoughts or behaviors, such as repeatedly checking if doors are locked, that prevents p