how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

A student was asked to simplify the expression 2(x+3)+(4x−8)−7x. Identify the line which contains the initial error. 1: 2(x+3)+(4x−8)−7x 2: 2x+6+4x+8−7x 3: (2x+
Help as soon as possible thanks
what is a water cycle​
Find the value of x Tell wether the side lengths form a Pythagorean triple
the length of a rectagle is 5 in longer than its width. if the perimeter of the rectangle is 56 in, find its length and width
The length is :____ meters and the width is ____meters.
A survey asked 100 seventh graders if they have either a cell phone or a tablet. Of the 32 students that have a cell phone, 19 do not have a tablet. Of the 70 s
samundra deposits rs 850 at NBL at the half yearly rate of 8% for 1 year. how much interest will he get?
What is the hydronium and hydroxide concentrations of a solution that is 5.0 x 10-3 M H2SO4.
Least common multiple of 45 and 7