kadenceclay26
kadenceclay26 kadenceclay26
  • 03-10-2016
  • Mathematics
contestada

a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

charstar
charstar charstar
  • 03-10-2016
54/3=18

hope this helps :)
Answer Link

Otras preguntas

Solve X.Do help need it quickly, will rate as the brainliest!​
If 7 men can do a job in 24 days and 3 men are fired from the job how long will the remaining men take
You buy 1.95 pounds of oranges and 1.65 pounds of apples. Oranges and apples sell for the same price per pound. The total​ cost, after using a 75¢​-off ​coupon,
You have a dog walking business. You charge based on weight of the dogs. For 45 min walk your prices are 0-15lbs you charge $5 15-45lbs you charge $7 Over 45lb
2. Why do Earth's tectonic plates move? A. Ocean currents near the mid-ocean ridge push the plates.B. Liquid iron in the outer core causes them to move.C. Gravi
Subtract 9x + 2 from 2x -7
i need help with elimination the equation is -3x + 2y= 7 and 4x + 4y= -6
The palm of sheilas hand has an area of 0.0017 m2. If the atmospheric pressure on the palm is 100,000 Pa, what force is being exerted on Sheila's palm by the at
all rules to find work in changing force in physics ​
The author most likely wrote this article